Common Issues and Design Considerations for Lift Stations

When:  Aug 18, 2020 from 12:00 PM to 01:00 PM (PT)

Free Virtual Monthly Lunch

This Month's Topic is...

Common Issues and Design Considerations for Lift Stations

Presented by:
Johnny Alhwayek & Tim Newell

Johnny Alhwayek

Johnny Alhwayek

Johnny Alhwayek has over 11 years of experience in the broad field of Civil Engineering. Starting out as an NDOT inspector after graduation, he currently works at CCWRD Development Services as a Senior Civil Engineer. The path that led him there included experience with roadway design and construction management. At any reasonable chance he gets, he will jump into Visual Basic for Applications (VBA) and try to optimize workflows.

Tim Newell

Tim Newell

Tim Newell has over 10 years of experience in water and wastewater engineering. He has experience in performing feasibility analyses, planning studies, hydraulics of gravity sewer systems, hydraulics of pressurized systems, and sewer and water system modeling. He currently works in the CCWRD Modeling Department as a Senior Civil Engineer.